The published map allows to consult and download the maximum capacity (in MW) available for a storage facility on each substation concerned, without limitation.
This capacity is therefore available for both withdrawal and injection. The map was published on 24 March 2025.
The detailed analyses of RTE's Annual Electricity Review 2024 on electricity consumption are now available!
You can access the published chapter in this section (in French only).
The detailed analyses of RTE's Annual Electricity Review 2024 on exchanges and wholesale electricity prices are now available!
You can download the published chapters in this section (in French only).